SCR759
Summary
Title | acLineSegment Name Length Increase in Information Model Manager |
---|---|
Next Group | |
Next Step | |
Status | Approved on 09/21/2010 |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
09/21/2010 | BOARD | Approved | Parking Deck - Impact Analysis and budget review |
09/02/2010 | TAC | Recommended for Approval | ERCOT Board consideration of SCR759 |
08/19/2010 | PRS | Recommended for Approval | TAC consideration of SCR759 |
08/12/2010 | ROS | Recommended for Approval | PRS priority assignment |
07/15/2010 | ROS | Recommended for Approval | ROS Impact Analysis review |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
09/21/2010 | BOARD | To approve SCR759 as recommended by TAC in the 9/2/10 TAC Report. | Passed |
09/02/2010 | TAC | To recommend approval of SCR759 as recommended by PRS in the 8/19/10 PRS Report with a priority of High. | Passed |
08/19/2010 | PRS | To recommend a priority of High for SCR759. | Passed |
08/12/2010 | ROS | To endorse and forward the 7/15/10 ROS Report and Impact Analysis for SCR759 to TAC with a recommended priority of High. | Passed |
07/15/2010 | ROS | To recommend approval of SCR759 as submitted. | Passed |
Background
Status: | Approved |
---|---|
Date Posted: | May 27, 2010 |
Sponsor: | SSWG |
Urgent: | No |
Sections: | N/A |
Description: | This System Change Request (SCR) proposes to increase the allowable character size of the acLineSegment type under the Line Equipment Container from two to 14 in the Information Model Manager. |
Reason: | Multi-section line models have been used by transmission planners in Siemens Power System Simulator for Engineering (PSSE) power flow software for over 20 years as a tool for correctly simulating contingencies on the ERCOT System for planning studies. The Topology Processor enhancement approved by ERCOT in April 2010 to add multi-section line definitions to the raw file output requires all line segments of the multi-section line to be modeled under the same Line Equipment Container in the Network Operations Model. The reason that some Transmission Service Providers (TSPs) are not modeling line segments in this manner in the Information Model Manager is that the acLineSegment name is currently limited to two characters, which is too limiting for many TSPs line segment IDs. To be able to make this change to the Network Operations Model, the acLineSegment name must be increased. If this increased name size is not changed, the multi-section line functionality of the Topology Processor cannot be utilized. |
Key Documents
May 27, 2010 - doc - 181 KB
May 27, 2010 - doc - 70.5 KB
Jul 16, 2010 - doc - 190 KB
Jul 27, 2010 - doc - 45 KB
Aug 12, 2010 - doc - 192.5 KB
Aug 23, 2010 - doc - 190.5 KB
Sep 3, 2010 - doc - 198 KB
Sep 22, 2010 - doc - 183 KB
Dec 5, 2010 - doc - 87 KB