Approved for consideration for implementation in TX SET 3.0
Background
Status:
Closed
Date Posted:
07/13/2006
Sponsor:
Centerpoint Energy
Urgent:
No
Sections:
814_20
Description:
A TDSP may create ESI IDs using subdivision plats and at this time no TDSP equipment has been installed. These ESI IDs are created with a profile based on the assumption that each address may be residential with the intention later on being to correct the profile, if necessary, when the metering equipment is installed and energized. The ESI ID’s Load Profile cannot be modified without meter data because currently in the implementation guides whenever Load Profile is changing the meter data (meter number, multiplier, and meter type) is required, however all the information may not be available at the time when the profile is being corrected.
Reason:
The issue with is that the ESI ID’s Load Profile cannot be modified without meter data because currently in the implementation guides whenever Load Profile is changing the meter data (meter number, multiplier, and meter type) is required, however all the information may not be available at the time when the profile is being corrected. Most of the time all the details of the meter information is forthcoming later when the field crew turns in their paperwork with all the meter attributes for posting into the TDSP’s internal system.
This issue in some cases is delaying the updating of load profile information into ERCOT’s system because Meter Multiplier and Meter Type is required for Load Profile NM101 =MQ has not been updated; however service has been energized to premise. This results in issues because of Annual Validation may be delayed or prevented on the ESI IDs that are still being held by the TDSP
Also, in some other situations, the meter data/attributes are required when changing load profile the TDSPs are forced to provide default values to provide the correct Load Profile into ERCOT’s system that serves no purpose to the Competitive Retailer, it is only a placeholder until the correct