Modification of the original YNQ segment to communicating two uses -- either the meter test results or the service status
Next Step:
This is considered a guide clean-up on a non-emergency basis. This is combining the 2-YNQ segments into one YNQ segment. Approved as written and needs to be written as a change control. Suzette Sondag will write the change control.
This is considered a guide clean-up on a non-emergency basis. This is combining the 2-YNQ segments into one YNQ segment. Approved as written and needs to be written as a change control. Suzette Sondag will write the change control.
Background
Status:
Closed
Date Posted:
01/16/2007
Sponsor:
EC Power
Urgent:
No
Sections:
650_02
Description:
V3.0 adds a duplicate YNQ~~Y~~~~~~9~RES segment to the 65002. This segment currently exists in the 65002, and is used for acknowledging a Meter Test. With V3.0, this segment was added again, and is used to communicate whether service at a premise was left on or off. Rather than add the segment to the 65002 again, the original YNQ segment should be modified for communicating both -- either the meter test results or the service status.
Reason:
Possible unnecessary coding -- depending on how the IG is implemented.