Remove Critical Care/Critical Load indicator from CR initiated transactions by eliminated the REF SU segment from the 814_01, 814_16 and the 814_PC.
Next Step:
Based on today’s discussion revealing the fact that AEP and possibly other TDSPs use the CC flag to maintain protections on customer accounts; the submitter has requested to withdraw this Issue. Issue is Withdrawn.
Based on today’s discussion revealing the fact that AEP and possibly other TDSPs use the CC flag to maintain protections on customer accounts; the submitter has requested to withdraw this Issue. Issue is Withdrawn.
Background
Status:
Closed
Date Posted:
07/03/2008
Sponsor:
Direct Energy
Urgent:
No
Sections:
814_01, 814_16, 814_PC
Description:
Remove Critical Care/Critical Load indicator from CR initiated transactions by eliminated the REF SU segment from the 814_01, 814_16 and the 814_PC.
Reason:
This puts Direct Energy in the position of telling the TDSP whether or not a Premise is Critical Care or Critical Load and it is not the CR’s responsibility to make this determination. We are having some transactions rejected by the TDSP when there is a discrepancy between what we have in our system and what TDSPs has in theirs.