The 650_04 HL loop is required when BNG08 = S2 (suspended) if the TDSP can estimate the time. Should this be optional instead of mandatory? The TDSP does not know when all disconnects will be turned back on.
Next Step:
TX SET recommends closing this issue without a change. The terminology being questioned is not uncommon in the I.G.s and is designed to describe the field as conditional.
TX SET recommends closing this issue without a change. The terminology being questioned is not uncommon in the I.G.s and is designed to describe the field as conditional.