Change control was submitted for Texas SET consideration.
Background
Status:
Closed
Date Posted:
09/02/2011
Sponsor:
CenterPoint Energy
Urgent:
No
Sections:
814_04 and 650_02
Description:
Change control 2010-739 was approved by RMS added a new PER~PO segment for Power Outage to the 814_PC transaction didn’t include or clarify that the TDSP would be expecting only 1 PER~PO segment that contains customer contact information instead of multiple PER~PO loops that could be either rejected or the additional loops disregarded by the TDSP since they didn’t build to receive multiples.
Change control 2010-753 and 2010-754 were approved by RMS will need to be clarified that the REF~1P (Status Reason) segment is required in the 650_02 response for the new REF~8X Purpose Code of FI012 or FI013 request since these will require follow-up actions by the TDSPs as a response to the CRs 650_01.
Reason:
May negatively impact transactional processes in completing these two transaction types for either the TDSP and/or CR.