Some TDSPs create ESI IDs using subdivision plats and at this time no TDSP equipment has been installed. These ESI IDs are create with a profile based on the assumption that each address may be residential with the intention later on being to correct the profile, if necessary, when the metering equipment is installed and energized.
Next Step:
The issue is that the ESI ID's Load Profile cannot be modified without certain required meter data (type/multiplier) because currently in the implementation guides whenever Load Profile is changing the meter data (multiplier and meter type) are required, however all the information may not be available at the time when the profile is being corrected. Most of the time all the details of the meter information is forthcoming later when the field crew turn in their paperwork with all the meter attributes for posting into the TDSP's internal system. This has not prevented the TDSP from energizing the premise from the initial Move-In request.
The issue is that the ESI ID's Load Profile cannot be modified without certain required meter data (type/multiplier) because currently in the implementation guides whenever Load Profile is changing the meter data (multiplier and meter type) are required, however all the information may not be available at the time when the profile is being corrected. Most of the time all the details of the meter information is forthcoming later when the field crew turn in their paperwork with all the meter attributes for posting into the TDSP's internal system. This has not prevented the TDSP from energizing the premise from the initial Move-In request.
Background
Status:
Implemented
Date Submitted:
07/03/2006
Submitter Name:
Kathy Scott
Submitter Company:
CenterPoint Energy
Emergency:
No
Sections:
814_20
Description:
Some TDSPs create ESI IDs using subdivision plats and at this time no TDSP equipment has been installed. These ESI IDs are create with a profile based on the assumption that each address may be residential with the intention later on being to correct the profile, if necessary, when the metering equipment is installed and energized.