ERCOT needs to make a system change to only Require REF~5I (Reason for Estimate) for IDR (Interval) ESI IDs if the PTD*BO IA Net Interval Usage Summary "QTY" is equal to "KA" (Quantity Estimated), otherwise this segment would not be present.
Next Step:
Make corrections to the graybox language and also in the graybox REF~5I Segment that this segment is Required for IOU TDSPs. Approved as Emergency Change as Post 3.0.
Make corrections to the graybox language and also in the graybox REF~5I Segment that this segment is Required for IOU TDSPs. Approved as Emergency Change as Post 3.0.
Background
Status:
Implemented
Date Submitted:
07/09/2007
Submitter Name:
Kathy Scott
Submitter Company:
CenterPoint Energy
Emergency:
Yes
Sections:
867_03
Description:
ERCOT needs to make a system change to only Require REF~5I (Reason for Estimate) for IDR (Interval) ESI IDs if the PTD*BO IA Net Interval Usage Summary "QTY" is equal to "KA" (Quantity Estimated), otherwise this segment would not be present.
Reason:
ERCOT will correct their systems to only Require REF~5I (Reason for Estimate) for:-IDR ESI IDs if the PTD*IA Net Interval Usage Summary ‘QTY’ is equal to ‘KA’ (Quantity Estimated), otherwise this segment would not be present. -Non-IDR ESI IDs if the PTD*SU Non-Interval Usage Summary ‘QTY’ is equal to ‘KA’ (Quantity Estimated, otherwise this segment would not be present.Include in graybox the REF~5I is only "Required for IOU TDSPs".