TXSETCC712

Summary

Title: ERCOT needs to make a system change to only Require REF~5I (Reason for Estimate) for IDR (Interval) ESI IDs if the PTD*BO IA Net Interval Usage Summary "QTY" is equal to "KA" (Quantity Estimated), otherwise this segment would not be present.
Next Step: Make corrections to the graybox language and also in the graybox REF~5I Segment that this segment is Required for IOU TDSPs. Approved as Emergency Change as Post 3.0.
Status: Implemented

Action

Date Gov Body Action Taken Next Steps
07/10/2007 TXSET Approved Make corrections to the graybox language and also in the graybox REF~5I Segment that this segment is Required for IOU TDSPs. Approved as Emergency Change as Post 3.0.

Background

Status: Implemented
Date Submitted: 07/09/2007
Submitter Name: Kathy Scott
Submitter Company: CenterPoint Energy
Emergency: Yes
Sections: 867_03
Description: ERCOT needs to make a system change to only Require REF~5I (Reason for Estimate) for IDR (Interval) ESI IDs if the PTD*BO IA Net Interval Usage Summary "QTY" is equal to "KA" (Quantity Estimated), otherwise this segment would not be present.
Reason: ERCOT will correct their systems to only Require REF~5I (Reason for Estimate) for:-IDR ESI IDs if the PTD*IA Net Interval Usage Summary ‘QTY’ is equal to ‘KA’ (Quantity Estimated), otherwise this segment would not be present. -Non-IDR ESI IDs if the PTD*SU Non-Interval Usage Summary ‘QTY’ is equal to ‘KA’ (Quantity Estimated, otherwise this segment would not be present.Include in graybox the REF~5I is only "Required for IOU TDSPs".
Version: 3.0
Protocol Impact: No