MIS LOG IN

Controllable Load Resource Base Point Deviation Charge for Over-Consumption Variables

The Controllable Load Resource Base Point Deviation Charge for over-consumption variables XO and YO shall be posted to the MIS Public Area after TAC approval.

np6-651-m

13228

Active

Chron - As Needed

3-19-2014

Public

Public

N/A

NP6.6.5.1.1.3(2)

11-28-2023

Public

N/A

xls

N/A

N/A

N/A

Report

N/A

1

Nodal

N/A

N/A

Friendly Name Posted Available Files