MIS LOG IN

Power Operations Bulletins 2003 Archive

Date Subject Bulletin No.
12/10/2003 Procedure when OOMEing Combined Cycle Units Off Line - Transmission & Security Deskand 58 ( – )
12/04/2003 Replace RRS Through a Bilateral Trade - Operating Period Desk 57 ( – )
12/02/2003 Replace RRS Through a Bilateral Trade - Frequency Control Desk 56 ( – )
12/02/2003 Revision to the Transmission and Security Desk 55 ( – )
12/02/2003 Revision to Day Ahead Desk 54 ( – )
11/11/2003 Revision to Day Ahead Desk 53 ( – )
10/15/2003 Revision to Day Ahead Desk Procedure 52 ( – )
10/17/2003 Revision to Day Ahead Desk 51 ( – )
10/15/2003 Revision to the Frequency Control Desk 50 ( – )
10/15/2003 Revision to the Transmission and Security Desk 49 ( – )
10/15/2003 Revision to Operating Period Desk 48 ( – )
10/10/2003 Revision to Frequency Control Desk 47 ( – )
10/10/2003 Revision to Transmission and Security Desk 46 ( – )
10/09/2003 Revision of Operating Period Desk 45 ( – )
10/02/2003 Temporary solution to provide TOs with information on Planned Outages that require movement of generation 44 ( – )
10/02/2003 Revision to the Operating Procedures 43 ( – )
10/02/2003 Revision of Operating Period Desk Procedures 42 ( – )
10/02/2003 Revision of Transmission and Security Desk 41 ( – )
09/30/2003 Revision to the Transmission and Security Desk Procedures 40 ( – )
09/30/2003 Revision of the Operating Period Desk Procedures 39 ( – )
09/30/2003 Revision of Frequency Control Desk Procedures 38 ( – )
09/30/2003 Revision of Day-Ahead Desk Procedures 37 ( – )
09/30/2003 Revision of Direct Current Ties Procedures 36 ( – )
09/16/2003 Procedure when OOMEing Combined Cycle Units Off Line 35 ( – )
09/04/2003 Revision of Operating Procedures 34 ( – )
08/27/2003 Revised the Forced/Level 1 Outage Information Sheet 33 ( – )
08/27/2003 Actual Start and End Entries - Outage Scheduler Enhancements 32 ( – )
07/25/2003 Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis 31 ( – )
07/24/2003 Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis 30 ( – )
07/16/2003 Revision of Operating Procedures Development and Maintenance 29 ( – )
07/14/2003 Revision of Cancelled Outages 28 ( – )
07/14/2003 Revision of timeline for BES 27 ( – )
07/08/2003 Revision of Operating Procedures 26 ( – )
06/30/2003 Revision of Operating Procedures 25 ( – )
06/25/2003 Revision of Operating Procedures 24 ( – )
06/19/2003 Load Shed Ratios assigned to Transmission Operators in ERCOT for shedding firm load during step 4 of EECP 23 ( – )
06/06/2003 Voltage Collapse of Bryan-College Station Area April 15,2003 22 ( – )
05/28/2003 Revision of Operating Procedures 21 ( – )
05/21/2003 Revision of Operating Procedures 20 ( – )
05/09/2003 Revision of Operating Procedures 19 ( – )
04/29/2003 Revision of Operating Procedures 18 ( – )
04/01/2003 Revision of Operating Procedures 17 ( – )
03/06/2003 Revision of Operating Procedures 15 ( – )
02/13/2003 Revision of Operating Procedures 14 ( – )
01/07/2003 Revision of Operating Procedures 13 ( – )
01/07/2003 Revision of Operating Procedures 12 ( – )