Date |
Subject |
Bulletin No. |
12/01/2005 |
Frequency Control Desk - Loss of Unit/Resource Plan Update |
230
( – )
|
12/01/2005 |
T&S Desk - Maintenance Level 2 & 3 Outages |
229
( – )
|
12/01/2005 |
T&S Desk - Block Load Transfer |
228
( – )
|
12/01/2005 |
FC Desk - DC Ties |
226
( – )
|
12/01/2005 |
FC Desk - South DC Tie |
225
( – )
|
11/09/2005 |
T&S Desk - SCADA Tags |
224
( – )
|
10/27/2005 |
T&S Desk - Voltage Issues and Contingency Analysis |
223
( – )
|
10/10/2005 |
T&S Desk - Emergency Site Failover |
222
( – )
|
10/10/2005 |
SS Manual - Monitor QSEs Which Under Perform in Supplying Ancillary Services |
221
( – )
|
10/10/2005 |
DA Desk - VDI Instruction |
220
( – )
|
10/10/2005 |
FC Desk - Emergency Site Failover |
219
( – )
|
10/03/2005 |
T&S Desk - Voltage Support |
218
( – )
|
09/30/2005 |
T&S Desk Temporary Change - Block Load Transfer |
217
( – )
|
09/29/2005 |
T&S Desk Temporary Change - Procedure to Cancel OOMEs |
216
( – )
|
09/29/2005 |
T&S Desk Temporary Change - Maintenance Level 2 & 3 Outages |
215
( – )
|
09/29/2005 |
T&S Desk Temporary Change - Western Area Action Plan |
214
( – )
|
09/29/2005 |
FCD - V2R32 |
213
( – )
|
09/27/2005 |
FC Desk Temporary Change - DC Ties |
212
( – )
|
09/29/2005 |
Transmission & Security Desk - V3R59 |
211
( – )
|
09/20/2005 |
FC Desk - Emergency Site Failover |
210
( – )
|
09/20/2005 |
OP Desk - V2R13 |
209
( – )
|
09/20/2005 |
Shift Supervisor Desk - Root Cause Analysis |
208
( – )
|
08/29/2005 |
OP Desk - OOME Respond to Hour-Ahead Study Results |
207
( – )
|
08/29/2005 |
Transmission and Security Desk - OOME - VDI Guidelines |
206
( – )
|
08/15/2005 |
Transmission and Security Desk - VDI for Oklaunion Temporary Change |
205
( – )
|
08/10/2005 |
Shift Supervisor Desk - V3R20 |
203
( – )
|
08/09/2005 |
Frequency Control Desk - Unscheduled Generation |
202
( – )
|
08/09/2005 |
Shift Supervisor Desk - ERCOT Procedure for Unit Testing |
201
( – )
|
08/05/2005 |
Transmission and Security Desk V3R53 - DFW Dynamic Reactive Reserves |
200
( – )
|
08/02/2005 |
Transmission and Security Desk V3R52 |
199
( – )
|
08/02/2005 |
Frequency Control Desk - V3R28 |
198
( – )
|
08/02/2005 |
Frequency Control Desk - V3R28 |
197
( – )
|
08/02/2005 |
Day Ahead Desk - V3R19 |
196
( – )
|
08/02/2005 |
Changes to the Special Protection Schemes Procedure |
195
( – )
|
07/22/2005 |
Special Protection Schemes |
194
( – )
|
07/05/2005 |
Shift Supervisor Desk - Procurement of Additional RRS |
193
( – )
|
07/05/2005 |
Shift Supervisor Desk - V3R15 |
192
( – )
|
07/01/2005 |
Summary of Steady State Voltage Control |
191
( – )
|
06/30/2005 |
Transmission and Security Desk V3R51 - DFW Reactive Reserves |
190
( – )
|
06/30/2005 |
Transmission and Security Desk - Remedial Action Plans |
189
( – )
|
06/30/2005 |
Transmission and Security Desk - RTCA Congestion Management |
188
( – )
|
06/30/2005 |
Frequency Control Desk - Maintenance Level 2 and 3 Outages |
187
( – )
|
06/30/2005 |
Frequency Control Desk - Replace RRS through a Bilateral Trade |
186
( – )
|
06/30/2005 |
Frequency Control Desk - South DC Tie |
185
( – )
|
06/21/2005 |
Transmission and Security Desk - Guidelines for Withdrawal of an Outage |
184
( – )
|
06/21/2005 |
Transmission and Security Desk - Manage Forced and Level 1 Maintenance Outages |
183
( – )
|
06/21/2005 |
Operating Period Desk - Temporary Change: Automated Offset Calculations |
182
( – )
|
06/21/2005 |
Transmission and Security Desk - Temporary Change: Maintenance Level 2 and 3 Outages |
181
( – )
|
06/16/2005 |
Transmission and Security Desk V3R46 - OOME VDI Guidelines |
180
( – )
|
06/16/2005 |
Transmission and Security Desk V3R45 - RTCA Congestion Management and Call Out Procedure |
179
( – )
|
06/16/2005 |
Transmission and Security Desk V3R44 - Remedial Action Plans |
178
( – )
|
06/14/2005 |
Transmission and Security Desk V3R43 - Mitigation Plans |
177
( – )
|
06/14/2005 |
Tranmsission and Security Desk V3R42 - Verbal Dispatch Instructions |
176
( – )
|
06/14/2005 |
Frequency Control Desk V3R27 - Verbal Dispatch Instructions |
175
( – )
|
06/14/2005 |
Frequency Control Desk - Use of LAARs to Arrest a Reportable Low Frequency Disturbance |
174
( – )
|
06/06/2005 |
Transmission and Security Desk - Zonal (CSC) Congestion Management |
173
( – )
|
06/06/2005 |
Shift Supervisor Desk - QSE Transferring to Backup Control Center |
172
( – )
|
06/06/2005 |
Transmission and Security Desk - Temporary Change for Western Area Action Plan |
171
( – )
|
06/06/2005 |
Day Ahead Desk - Modified Non Spin Procurement Methodology |
170
( – )
|
06/02/2005 |
The Transmission Outage Approval Process |
169
( – )
|
05/17/2005 |
Transmission and Security Desk - Mitigation Plans |
168
( – )
|
05/17/2005 |
Transmission Desk - Procedure to Cancel OOMEs |
167
( – )
|
04/22/2005 |
FC Desk - Approve NERC Tags for DC Ties |
166
( – )
|
04/18/2005 |
Transmission and Security Desk - Issue an Advisory |
165
( – )
|
04/18/2005 |
Transmission and Security Desk - Procedure for Control of Transmission System Loading Within N-1 Thermal Contingency Criteria Using Real Time Contingency Analysis. |
164
( – )
|
03/29/2005 |
SS Desk - Geomagentic Disturbance Reporting |
163
( – )
|
03/17/2005 |
FC Desk - Maintenance Level 2 and 3 Outages |
162
( – )
|
03/17/2005 |
Transmission and Security Desk - Maintenance Level 2 and 3 Outages |
161
( – )
|
03/16/2005 |
OP Desk - Execute the HA Study |
160
( – )
|
03/15/2005 |
OP Desk - Automated Offset Calculations |
159
( – )
|
03/09/2005 |
Transmission and Security Desk - VDI for Oklaunion |
158
( – )
|
03/09/2005 |
FC Desk - Response to Frequency Decay. |
157
( – )
|
03/09/2005 |
Transmission and Security Desk - Issue VDE |
156
( – )
|
03/07/2005 |
Temporary Change - Transmission and Security Desk - Western Area Action Plan for Voltage Support |
155
( – )
|
03/07/2005 |
FC Desk - Issue VDE |
154
( – )
|
03/07/2005 |
FC Desk - Use of LAARS to Arrest a Reportable Low Frequency Disturbance |
153
( – )
|
02/08/2005 |
Shift Sup. - New Appendix for Media Appeals for Voluntary Load Curtailments |
152
( – )
|
02/11/2005 |
DA Desk - Enhance Sections 2.9 and 2.10 for additional market opernings; Add hotline call to Section 2.18 step 5 |
151
( – )
|
02/08/2005 |
Transmission and Security Desk - Update Appendix 8: Telephone Hotline |
150
( – )
|
02/08/2005 |
Transmission and Security Desk - Issue an Advisory |
149
( – )
|
02/04/2005 |
FC Desk - Actions When Frequency Telemetry is Incorrect. |
148
( – )
|
02/02/2005 |
OP Desk - Automated Offset Calculations. |
147
( – )
|
02/02/2005 |
Transmission and Security Desk - Managing the Wind Powered Generation Resources in the McCamey Area |
146
( – )
|
01/20/2005 |
Transmission and Security Desk - Procedure to Cancel OOMEs |
145
( – )
|
01/19/2005 |
FC Desk - Update section 2.5.2 Use of Responsive Reserve to Arrest Low Frequency |
144
( – )
|
01/19/2005 |
FC Desk - Update section 2.6.3 |
143
( – )
|
01/19/2005 |
FC Desk - Appendix 5: FC Desk Notification Message |
142
( – )
|
01/19/2005 |
FC Desk - Updated Appendix 4 - Telephone Hotline |
141
( – )
|
01/18/2005 |
DA Desk - Remove reference to opening additional market for insufficient AS bids |
140
( – )
|
01/18/2005 |
DA Desk - Update Appendix 4 - NSRS Procurement to Match 2004 AS Requirements Methodology document |
139
( – )
|
01/18/2005 |
Transmission and Security Desk - Appendix 8 Telephone Hotline update |
138
( – )
|
01/18/2005 |
FC Desk - Replace RRS Through a Bilateral Trade |
137
( – )
|
01/18/2005 |
Temporary Change - Frequency Control Desk CN191 |
136
( – )
|
01/18/2005 |
Temporary Change - Operating Period Desk CN192 |
135
( – )
|
01/13/2005 |
Transmission and Security Desk V3R30 |
134
( – )
|